Development archive
Devblog 4: Power, water and workshop infrastructure
The May 2023 infrastructure model connects water transport to workshop power and forge equipment; later Aqueduct and indoor-workshop changes alter its context.
What it does
Devblog 4, dated 29 May 2023, connects water infrastructure with industrial development. Aqueducts and Canals supply water, Water Wheels generate force, and powered equipment changes how Blacksmithing can be organized.
Devblog 4 · Complete announcement · · Devblog 4 · Aqueducts & Canals · · Devblog 4 · Building a Powered Workshop · · Devblog 4 · Advanced Smithing ·
Development history
Aqueducts move larger quantities between sources and Settlements and can be built across the world. Canals distribute smaller quantities locally and scale dynamically between settlement structures. The original model relies on downhill water movement and makes topography a placement consideration.
Devblog 4 · Aqueducts & Canals ·
Water Wheels over rivers or Canals propagate force through player-built pulleys and ropes. Power infrastructure is limited to Workshop Areas in that version; the design deliberately avoids a settlement-wide, technologically advanced-looking power grid.
Devblog 4 · Building a Powered Workshop ·
A Trip Hammer connected to an Anvil and a power source replaces manual hammering. Bellows attached to a Forge heat Ingots faster and to the higher temperatures associated with higher-quality Blades.
How the roles connect
The later December 2024 workshop design routes outside power and Canal water into modular Homestead interiors. September 2026 adds water passages through defensive walls, decay prevention for outside Aqueducts connected to a sustained Homestead, and constant flow without significant elevation changes.
Devblog 20 · HOMESTEAD WORKSHOP SUPPORT · · Devblog 30 · WATER INFRASTRUCTURE REVAMP ·
As a development archive, the post helps explain the relationship between supplying water and powering different forge tasks. If adapting an old workshop plan, review those relationships alongside the later routing and Aqueduct rules before treating a 2023 placement constraint as current. Reported
Devblog 4 · Aqueducts & Canals · · Devblog 4 · Advanced Smithing · · Devblog 20 · HOMESTEAD WORKSHOP SUPPORT · · Devblog 30 · WATER INFRASTRUCTURE REVAMP ·
Questions and practical limits
Exact flows, power transfer limits and production rates are not published. The later removal of a significant-elevation requirement does not prove that all gravity behaviour disappeared, and the earlier Workshop Area restriction is not a complete statement of the 2026 interior-building system. Not established
Devblog 4 · Aqueducts & Canals · · Devblog 4 · Building a Powered Workshop · · Devblog 30 · WATER INFRASTRUCTURE REVAMP ·
Sources
- Devblog 4 - Aqueducts, Canals, and Power — Complete announcement
Published 2023-05-29; consulted 2026-09-29. - Devblog 4 - Aqueducts, Canals, and Power — Aqueducts & Canals
Published 2023-05-29; consulted 2026-09-29. - Devblog 4 - Aqueducts, Canals, and Power — Building a Powered Workshop
Published 2023-05-29; consulted 2026-09-29. - Devblog 4 - Aqueducts, Canals, and Power — Advanced Smithing
Published 2023-05-29; consulted 2026-09-29. - Devblog 20 - Homestead Keystone & Interior Workshops — HOMESTEAD WORKSHOP SUPPORT
Published 2024-12-03; consulted 2026-09-30. - Devblog 30 - Cargo Boat Update, Naval Industry, House Tags, Map Expansion & More — WATER INFRASTRUCTURE REVAMP
Published 2026-09-11; consulted 2026-09-29.